Real results from real projects

Every case study below represents a completed engagement with measurable outcomes. Company names are withheld under NDA, but the numbers are real.

Automotive Parts · Germany

PLM Migration & CAD–PLM Connector

The Challenge

A mid-size automotive parts manufacturer was running a 15-year-old PLM system that no longer received vendor support. Engineering change orders took 5 days to process. CATIA files were stored locally and manually uploaded to the PLM — creating version conflicts and data loss across 3 engineering teams.

What We Did

Migrated the entire product data library (50,000+ documents) to a modern PLM platform. Built a direct CATIA-to-PLM connector so engineers save directly into the system with automated version control. Automated the engineering change order workflow with approval routing and status notifications across departments.

Results
-80%
Change order cycle time
0 hrs
Manual data re-entry
50K+
Documents migrated
6 wks
Total project duration

Services used: IT Health Check → Rapid Solution Sprint → Monthly Support

Industrial Components · Poland

SAP ↔ Production System API Integration

The Challenge

Production managers had no visibility into real-time inventory levels or order status. SAP ran in one silo, the factory floor planning system in another. Weekly reports were compiled manually in Excel — one person spent 15 hours every week building spreadsheets that were already outdated by the time they were finished.

What We Did

Built a custom REST API layer connecting SAP with the factory floor planning system. Created a real-time web dashboard accessible from any browser showing inventory, order status, and production KPIs. Automated the entire weekly reporting process with scheduled data extraction and formatting scripts.

Results
15 hrs
Saved per week
+30%
Faster fulfillment
Real-time
Inventory visibility
4 wks
Total project duration

Services used: IT Health Check → Rapid Solution Sprint

Electronics Manufacturer · EU

Production Dashboard + Batch Automation Scripts

The Challenge

Plant managers relied on daily email reports to track production KPIs — data was 12–24 hours stale. Meanwhile, a junior engineer spent 2 hours every morning manually processing 500+ part records: validating naming conventions, extracting metadata from CAD files, and exporting BOMs to CSV for the ERP system.

What We Did

Built a web-based production monitoring dashboard pulling live data from ERP and PLM via API — accessible on desktop, tablet, and factory floor displays. Developed Python automation scripts that process the entire part catalog nightly: validate files, extract metadata, generate BOM exports, and sync status across systems.

Results
Real-time
Production visibility
2 hrs/day
Manual work eliminated
500+
Parts processed nightly
4 wks
Total project duration

Services used: Rapid Solution Sprint + Automation Scripts

Your challenge could be our next case study

Book a free 30-minute call and tell us what's not working. If we can help, we'll tell you how. If we can't, we'll tell you that too.

Book Free Discovery Call →